| 1. |
ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ |
S1934
|
| 1. |
ਉੱਪ ਮੰਡਲ ਦਫਤਰ |
FARIDKOT/DS DIVN. BAGHAPURANA/DS S/D PATTO HIRA SINGH
|
| 2. |
ਖਪਤਕਾਰ |
F13MS130046 of Sh/ Ms Jai Durga Rice Mill
|
| 3. |
ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ |
2012-10-08
|
| 4. |
ਵਰਨਣ |
Due to huge difference in reading & consumption, connection was checked by Sr.Xen/DS Divn. Baghapurana & SDO Patto Hira Singh jointly on dt. 13.07.2012. Vide his checking report No. 50/53 on the basis of checking consumer account was overhaul from the month 7/2011 to 6/2012 as per 21.4 of the supply code. During the overhaul period meter status code from 8/2011 to 6/2012 was shown as \\\'D\\\' in the meter blank whereas during 7/2011 only 5750 units consumption was charged.
|
| 5. |
ਫੈਸਲਾ |
committee decided that amount charged the consumer is correct and recoverable.
|
| 6. |
ਫੈਸਲੇ ਦੀ ਮਿਤੀ |
2012-12-17
|
| ਸੁਣਵਾਈ/ ਪੇਸ਼ੀਆਂ |
|