ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ :
ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ: L2364
1.  ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ L2364
1.  ਉੱਪ ਮੰਡਲ ਦਫਤਰ FEROZPUR/DS S/U DIVN. FEROZEPUR/DS S/U S/D FEROZEPUR
2.  ਖਪਤਕਾਰ M44SR530121 of Sh/ Ms Commandant BSF Husan
3.  ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ 2013-01-28
4.  ਵਰਨਣ Connection checked by F/S Bathinda. on dated 4/10/2012 & found that meter was running slow by 57.31% while checking through ERS&EC on 6.31KW load. F/S also reported that 2 phases of meter found dead stop and only one phase of meter was running.on the basis of this checking account of the consumer was overhauled for the previous six month by enhancing consumption two times and charged Rs 251182/-.
5.  ਫੈਸਲਾ Committee after scrutinize the record, decided that A/C should be overhauled on the average basis of new meter actual consumption of 13118 unit of 56 days up to the date of MCO. committee also decided to overhauled the bill month of 1/13 which was made on 3112 units average on actual consumption basis.
6.  ਫੈਸਲੇ ਦੀ ਮਿਤੀ 2013-03-04