| 1. |
ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ |
G2827
|
| 1. |
ਉੱਪ ਮੰਡਲ ਦਫਤਰ |
SUB URBAN LUDHIANA/DS S/U DIVN. LALTON KALAN/DS S/D LALTON KALAN
|
| 2. |
ਖਪਤਕਾਰ |
U41DD123030 of Sh/ Ms Ravi Nandan Gupta
|
| 3. |
ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ |
2013-05-16
|
| 4. |
ਵਰਨਣ |
Excess consumption during 3/2013
|
| 5. |
ਫੈਸਲਾ |
As per ME Lab report the final readind of the meter was 1939, whereas the billing upto the reading of 1874 was already done in 1/2013 bill. So it is decided that A/c of 3/2013 may be overhauled as per actual consmption i.e (1939-1874)=65+568 (consumption of new meter)=633 units.
|
| 6. |
ਫੈਸਲੇ ਦੀ ਮਿਤੀ |
2013-08-22
|
| ਸੁਣਵਾਈ/ ਪੇਸ਼ੀਆਂ |
Page 1/1 |
|---|
| Sr No | ਸੁਣਵਾਈ ਦੀ ਮਿਤੀ | ਵਰਨਣ |
| 1 | Mon 10, Jun 2013 |
Consumer attended the meeting and said that his average consumption is about 300 units.SDO Lalton asked to present the ME Lab report in the next meeting. Case deffered. |
| |