ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ :
ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ: N3524
1.  ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ N3524
1.  ਉੱਪ ਮੰਡਲ ਦਫਤਰ CITY EAST LUDHIANA/DS S. NAGAR (SPL) DIVN./COMM. S. NAGAR (SPL)
2.  ਖਪਤਕਾਰ LS-128,141 of Sh/ Ms Youngman Wollen Mill
3.  ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ 2014-09-10
4.  ਵਰਨਣ Audit revised Estimate amount prepared during extension of both the accounts.
5.  ਫੈਸਲਾ Brief History There are two no. LS connections i.e. SN-01/0128 and SN-01/0141 running in name of M/S Youngman Woollen Mills Pvt. Ltd. The consumer applied for extension of load of a/c no.SN-01/0128 from existing load of 1077KW to 1990KW on dt.05.02.13 and requested for errection of independent feeder. The consumer further applied for extension of load of a/c no.SN-01/0141 from existing load of 494KW to 1175KW on dt.21.05.13. CE/Planning, Patiala cleared the feasibility of a/c no.SN-01/0128 vide memo no. 5853 dt. 06.08.13 and feasibility of a/c no.SN01-0141 vide memo no.6393 dt. 04.09.13. Dy.CE/Op. City East Circle, Ludhiana also gave permission for registration of application and approval for feasibility clearance. As per clause no. 2 of such permission “The cost of erection of new 11KV Industrial Youngman Feeder will be borne by you & M/S Youngman Pvt. Ltd. A/c no.: E-41-SN-01/00128 on proportionate basis as per actual cost of estimate.” The common estimate of both the connections was passed having estimate no.33228/13-14 dt.05.09.13 for RS.5302449. The consumer deposited the entire amount. A.O./Field, Ludhiana vide his office memo no.1240 dt.24.06.14 informed Sr.XEN./Op., Sunder Nagar Divn., Ludhiana that estimates of both the connections had to be prepared according to ESIM clause 14.2 and hence the cost of entire industrial Youngman feeder i.e.Rs.5302449 is to be charged from a/c no.SN-01/0128. Accordingly, separate estimates for both the connections are prepared by taking into consideration clause 9.1.2(B) of Supply Code, clause 14.2 of ESIM and clause 47.4 of COS. The consumer was issued notice no.2884 dt.7.8.14 on a/c no.SN-01/0128 for RS.2239680 after adjusting Rs.2939795 already deposited by the consumer and notice no.2885 dt.7.8.14 on a/c no.SN-01/0141 for RS.930680 after adjusting Rs.2362660 already deposited by the consumer.The consumer being disagreed with the above notice approached ZDSC. 5/6 Proceedings Sh. Kulbhushan Sharma, Director of firm appeared before the committee. In meeting dt.18.09.2014, the consumer submitted his detailed petition before the committee. The committee directed P.O. to submit parawise comments on the petition and also submit any other document relating to the case in the next meeting. In meeting dt. 17.10.2014, P.O. presented the above documents before the committee. A copy of the comments of Sr.XEN./Op., Sunder Nagar Divn., Ludhiana on the petition was also handed over to the consumer for study and rejoinder, if any. In meeting dt. 20.11.2014, the consumer presented rejoinder to the comments before the committee. The consumer further pleaded that his counsel is out of station and he wants that the rejoinder be discussed in the presence of his counsel. So, the committee on the request of the consumer deferred the case to the next meeting. In today’s meeting, the committee discussed, in detail, the rejoinder and instructions/regulations of ESIM, COS relating to the case with the counsel of the consumer. Decision The committee studied all the documents and deliberated the whole case. As per ESIM instruction no. 14.2, for both the connections of the consumer separate estimates were required to be prepared for release in extension of load and contract demand. For connection under A/C no. SN-01/0128, the total cost of estimate of new 11 KV feeder was Rs.51,79,475 whereas as per KVA, SCC were Rs.17,93,000. Therefore, an amount of Rs.51,79,475 was required to be deposited. After adjusting Rs.29,39,795 already paid by the consumer, balance amount of Rs.22,39,680 is recoverable as per clause 9.1.2(b) of Electricity Supply Code and Regulations and clause 47.1 of Conditions of Supply. For connection under A/C no. SN-01/0141, proportionate cost of common portion of line/feeder including circuit breaker at the sending end as per estimate was Rs.18,53,340 (i.e. 50,60,426X1150/3140), which is recoverable as per clause 47.4 of COS and further adjustable against the expenditure incurred for augmentation of feeder which might be necessitated and had borne the entire cost initially coming up for enhancement in his contract demand as per clause 47.5 of COS. The estimated cost of independent portion was Rs.1,17,794, whereas as per KVA, SCC for extension in contract demand were Rs.14,41,000. Therefore, an amount of Rs.14,41,000 is recoverable as per clause 9.1.2(b) of Electricity Supply Code and Regulations. So, total amount of Rs.18,53,340+14,41,000=32,94,340 is recoverable. After adjusting Rs.23,62,660 already paid by the consumer, the balance amount of Rs.9,30,680 is recoverable. The committee unanimously decided that, in total, Rs.31,70,360(Rs. 22,39,680+ Rs.9,30,680) is recoverable from the consumer in respect of both the connections (i.e. SN-01/0128 and SN-01/0141).
6.  ਫੈਸਲੇ ਦੀ ਮਿਤੀ 2014-12-04
ਸੁਣਵਾਈ/ ਪੇਸ਼ੀਆਂ
Page 1/1
 
Sr Noਸੁਣਵਾਈ ਦੀ ਮਿਤੀਵਰਨਣ
1 Fri 17, Oct 2014  Sh. Kulbhushan Sharma, Director of firm and Sh. Jaswant Singh, counsel of firm appeared before the committee. In meeting dt.18.09.2014, the consumer submitted his detailed petition before the committee. The committee directed P.O. to submit parawise comments on the petition and also submit any other document relating to the case in the next meeting. In today’s meeting, P.O. presented the above documents before the committee. A copy of the comments of Sr.XEN./Op., Sunder Nagar Divn., Ludhiana on the petition was also handed over to the consumer for study and rejoinder, if any. The case has been deferred.