ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ :
ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ: F5828
1.  ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ F5828
1.  ਉੱਪ ਮੰਡਲ ਦਫਤਰ CITY EAST LUDHIANA/DS F. POINT (SPL) DIVN./TECH. -II F. POINT (SPL)
2.  ਖਪਤਕਾਰ E32MS480400 of Sh/ Ms M/S Friends Engg.
3.  ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ 2015-10-20
4.  ਵਰਨਣ Dispute due to defective meter.
5.  ਫੈਸਲਾ committee decided that consumer a/c be overhauled for 6/15, 7/15 and to the change of meter on the basis of average of KVAH consumption recorded during 4/15 and 5/15
6.  ਫੈਸਲੇ ਦੀ ਮਿਤੀ 2016-01-20
ਸੁਣਵਾਈ/ ਪੇਸ਼ੀਆਂ
Page 1/1
 
Sr Noਸੁਣਵਾਈ ਦੀ ਮਿਤੀਵਰਨਣ
1 Tue 03, Nov 2015  P.O. submitted comments on the petition of consumer, committee directed P.O. to submit copy of ME Lab report and other relevant documents. Consumer didn't appear in the meeting
2 Fri 27, Nov 2015  P.O. produced the required documents
3 Tue 22, Dec 2015  Consumer presented his view before the committee, committee directed P.O. to submit consumption data from the date of release of connection to till date with date of reading.

ਜਰੂਰੀ ਸੂਚਨਾ: ਇਹ ਸੁਵਿਧਾ ਸਿਰਫ ਤੁਹਾਡੀ ਜਾਣਕਾਰੀ ਹਿੱਤ ਹੈ, ਉਪਰੋਕਤ ਆਰਟੀਕਲ ਨੂੰ ਕਾਨੂੰਨੀ ਸਲਾਹ ਨਾ ਮੰਨਿਆ ਜਾਵੇ, ਸਹੀ ਅਤੇ ਪੂਰੀ ਜਾਣਕਾਰੀ ਲੈਣ ਵਾਸਤੇ ਸਬੰਧਤ ਦਫਤਰ ਨਾਲ ਸੰਪਰਕ ਕਰੋ ਜੀ|