1.  ਉੱਪ ਮੰਡਲ ਦਫਤਰ GURDASPUR/DS CITY DIVN. BATALA/DS S/D SOUTH BATALA
2.  ਖਪਤਕਾਰ G13GT130153 of Sh/ Ms Budh Dev
3.  ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ 2015-06-04
4.  ਵਰਨਣ Meter was challenged because of meter was creeping forward by the consumer.
5.  ਫੈਸਲਾ The committee decided that the account of this consumer for the month 5/2015 should be overhauled on the bases of consumption for the month 5/2014 i.e. 831 units, with the entrust recoverable/refundable.
6.  ਫੈਸਲੇ ਦੀ ਮਿਤੀ 2016-04-26
ਸੁਣਵਾਈ/ ਪੇਸ਼ੀਆਂ
Page 1/1
 
Sr Noਸੁਣਵਾਈ ਦੀ ਮਿਤੀਵਰਨਣ
1 Tue 06, Oct 2015  First meeting was called on 6-10-2015 by the Circle DSC. The consumer did not attend the meeting. The case was differed till next meeting.
2 Tue 26, Apr 2016  Next Meeting was called on 26-4-2016 by Circle DSC. It was found by the committee that the meter was running fast by 21.56%. So, committee decided that the account fro the month 5/2015 will be overhauled as per consumption during 5/2014 which was 831 units and interest will be charged as per instructions of the department.