ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਵਿਵਾਦ ਨਿਪਟਾਰਾ ਕੇਸ

ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ :
ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ: H6723
1.  ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ H6723
1.  ਉੱਪ ਮੰਡਲ ਦਫਤਰ CITY EAST LUDHIANA/DS F. POINT (SPL) DIVN./TECH. -I F. POINT (SPL)
2.  ਖਪਤਕਾਰ E31RR010037 of Sh/ Ms Renu Rani
3.  ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ 2016-02-18
4.  ਵਰਨਣ Dispute due to amount charged for difference of units last billed and reading noted on MCO.
5.  ਫੈਸਲਾ After deliberating the case, Committee decided that the consumer a/c be overhauled from 6/14 to change of meter with the average of KWH consumption recorded during 3/14, 4/14 and 5/14
6.  ਫੈਸਲੇ ਦੀ ਮਿਤੀ 2016-04-20
ਸੁਣਵਾਈ/ ਪੇਸ਼ੀਆਂ
Page 1/1
 
Sr Noਸੁਣਵਾਈ ਦੀ ਮਿਤੀਵਰਨਣ
1 Thu 10, Mar 2016  Committee said consumer to submit his petition in the Divn. office and directed P.O. to submit comments on the consumer petition, Copy of LCR for change of challenged meter, fresh LCR with connected load in the next meeting.
2 Tue 29, Mar 2016  P.O. submitted the required documents. But, P.O. didn't appear in the meeting. On consumer request, Committee deferred the case.