ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ |
E9499
|
| 1. |
ਉੱਪ ਮੰਡਲ ਦਫਤਰ |
BARNALA/DS CITY DIVN. BARNALA/DS CITY S/D BARNALA
|
| 2. |
ਖਪਤਕਾਰ |
30020211261 of Sh/ Ms Rajesh Kumar
|
| 3. |
ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ |
2023-04-20
|
| 4. |
ਵਰਨਣ |
New solar meter was installed on 15.07.2022 and the bill from 15.07.2022 to 13.09.2022 were issued on \'R\' code, but as per consumer new solar meter after burnt was installed on 01.08.2022. So account to be overhauled accordingly.
|
| 5. |
ਫੈਸਲਾ |
On investigation record it is fount that new meter was installed on 04.08.2022 but it is installed in SAP on 13.09.2022. So average bill charge from 14.07.2022 to 13.09.2022 is wrong. So the bill from 14.07.2022 to 03.08.2022 as per LYSM and from 04.08.2022 to 13.09.2022 as per reading of new meter
|
| 6. |
ਫੈਸਲੇ ਦੀ ਮਿਤੀ |
2023-05-25
|