| 1. |
ਕੇਸ ਹਵਾਲਾ ਨੰਬਰ |
Q9505
|
| 1. |
ਉੱਪ ਮੰਡਲ ਦਫਤਰ |
BARNALA/DS DIVN. MALERKOTLA/DS S/D LASSOI
|
| 2. |
ਖਪਤਕਾਰ |
L31ZD310012 of Sh/ Ms Hardev Singh
|
| 3. |
ਕੇਸ ਦਾਖਲ ਕਰਨ ਦੀ ਮਿਤੀ |
2023-01-24
|
| 4. |
ਵਰਨਣ |
New solar meter was installed on 11/2018 as per checking by AE/Enforcement on 13.08.2022 it is found that wires of R&B phase are not joint correctly, which was corrected on the spot and it was ordered to correct the bills generated during this period.
|
| 5. |
ਫੈਸਲਾ |
As this connection is of college and college was remained close during the covid period due to which there was no consumption, so account to be overhauled as per the consumption in SYSM (8/2022) and while overhauling the account net metering regulations to be consider in mind.
|
| 6. |
ਫੈਸਲੇ ਦੀ ਮਿਤੀ |
2023-05-25
|